Representative Projects
Turning Stone Casino High Rise Hotel, Event Center, Wintergarden, Parking Garage, and Golf Courses
![]() High Rise Hotel |
![]() Event Center |
|
Merit provided all electrical construction work for
the Turning Stone Casino Resort Tower Hotel, Other
projects were completed by Merit under separate contracts include the
parking garage, championship golf courses, co-generation plant and the
original casino. |
Syracuse University: School of Management,
Architecture and Life Science:
School of Management |
160,000 square foot building with 200 seat auditorium, 22
state-of-the-art classrooms, 40 meeting rooms, student lounges, café,
Executive education center, grand hall and investment Institute.
Merit installed all Electrical, Specialty Lighting, Life Safety,
and Audio/Video Systems. |
School of Architecture |
The former
Dunk & Bright Furniture warehouse, shown here after
The project
was a complete renovation of the 8 story building, totaling 145,000
square feet. Opened for
classes in January, 2006, it
is the first off-campus facility for |
![]() School of Life Science |
Artist rendition of completed project.
Completion date: 2008 Merit is performing all
electrical and communications work on this 5-story, 230,000 square foot
OSHA Partnership project. |
Colgate University - Multiple Site Utility Projects, Case Library. Campus-wide Wireless Network,
Student Housing
Case Library and Center For Information Technology |
Merit performed all electrical, life-safety, security,
and building temperature control work for the 105,000 square foot
renovation and 67,000 square foot new addition.
This is a certified LEED project. |
Town Houses |
Merit performed all electrical, life-safety and communications for the Colgate University Townhouse student housing project, a 9-building complex. |
Tioga Downs - Nichols, New York
![]() |
Under subcontract to ADT Security Services, Merit
installed over 230 cameras throughout the gaming area and the perimeter
of the new building.
Included in this was the installation of security console cabling and
terminations. Also included
in this project was the installation of power supplies for the CCTV and
access control systems. Merit performed similar projects at the |
Solvay Paperboard - Various additions, upgrades and expansions
![]() |
Paper Mill- 1
Upgrade - 2006
1.
New 2500KVA transformer and 4000Amp 480volt
switchgear for the Stock Prep distribution Area.
2. Ten
New variable frequency drives and two new Motor Control Centers.
3. New conveyer for raw
material procurement.
4.
Fiber optic backbone
cabling for DCS control system.
5.
Network
communication cabling between all VFD’s, MCC’s, PLC’s and bench board
consoles to new DCS server room.
6.
Installation of
power, control, and instrumentation cabling to 50 motors on paper
machine and pulp process areas.
7. Installation of 45
new VFD’s and two MCC’s in the PM-1 drive room.
8. Upgrades to all
bench board consoles including keypads, monitors, and joysticks. Duration of this project was
one year, with a ten day outage using an average of 65 skilled tradesman
for each of the two 12 hour shifts worked during
the outage.
|
Sensis Corporation - 120,000 square foot aerospace design facility.
Holiday Inn Express - Syracuse New York Airport
Home Depot - Maintain electrical, fire alarm and building control systems for over 25 stores. Similar services are provided for other national retailers.
To learn more about Syracuse Merit, contact Jim Maloney or Don Coon.